Case study: Kuka welding robots provide top quality in 13 minutes

Kuka Robotics UKcontact supplier

‘Top quality in 13 minutes’

BOA wanted a solution for processing welding tasks faster, more cost-effectively and with high quality. It opted for a TIG welding cell with a Kuka robot for the manufacture of sheet-metal constructions. A Kuka KR 15 L6/2 robot works at two work stations in a cell. Both stations are equipped with a DKP 400 two-axis positioner in order to provide the required flexibility. This case study explains the resulting benefits.

Related Files

Sign in Register You need to be signed in to view the files below:

Click on the link above to download the case study.

 

Top quality in 13 minutes

Add to my alerts

You need to be logged in to add alerts.

Sign in